City Wide Adjust Sewer Manhole to Grade, Cured in Place
Pipe (CIPP) Liner
Project Summary
|
Cost: |
$515,095.00 |
| Status: |
Completed |
| Start Date :
|
09/04/2012 |
| End Date : |
12/21/2012 |
| Ward : |
7 |
| Contact: |
| |
Steve Howard |
Brandi Becker |
| |
Chief Construction Inspector |
Senior Administrative Analyst |
| |
951-712-3904 |
951-826-2306 |
Description
This project consists of the following work:
- Replacement of an existing
8-inch Vitrified Clay Pipe sanitary sewer along Bolivar Street (Bleeker
Court to Campbell Avenue).
- Replacement of an existing 8-inch
Vitrified Clay Pipe sanitary sewer along Sierra Vista Avenue (Gedney
Way to Richmond Street).
- Installation of
sewer clean-out structures at the property line, sewer manholes
and sewer laterals.
- Adjusting buried
manholes to grade and lining existing sewer main with cured in
place pipe (CIPP) liner.