City of Riverside
Home
Government
Online Services
Residents
Business
Visitors
Media
Jobs
home
>
public works
Sewers, Stormdrains & Wastewater Treatment
Sewer Home
Construction Requirements
Design Guidelines and Forms
Public Education
Total Maximum Daily Loads
Public Works Home
Wastewater Integrated Master Plan
All documents linked below are in PDF format.
Volume 1 - Executive Summary
Chapter 1 - Executive Summary
Volume 2 - Basis of Planning
Chapter 1 - Introduction
Chapter 2 - Regulatory Requirements
Chapter 3 - Population and Flow Projections
Chapter 4 - Basis of Cost Estimates
Volume 3 - Wastewater Collection System
Chapter 1 - Wastewater Collection System
Volume 4 - Wastewater Treatment System
Chapter 1 - Existing Facilities
Chapter 2 - Summary of Planning Studies
Chapter 3 - Process Design and Reliability Criteria
Chapter 4 - Plant Hydraulics
Chapter 5 - Preliminary Treatment
Chapter 6 - Primary Treatment
Chapter 7 - Secondary Treatment
Chapter 8 - Tertiary Treatment
Chapter 9 - Disinfection
Chapter 10 - Recycle Stream Management
Chapter 11 - Plant Utilities and Support Facilities
Chapter 12 - Primary Effluent Equalization
Chapter 13 - Proposed Expansion Plan and Site Layout
Chapter 14 - Implementation Schedule and Cost
Volume 5 - Air Quality and Emissions Control
Chapter 1 - Review of the 2005 Odor Control Master Plan
Chapter 2 - Review of Applicable Regulatory Requirements
Volume 7 - Reclamation and Reuse
Chapter 1 - Reclamation and Reuse
Volume 8 - Solids Treatment and Handling
Chapter 1 - Existing Facilities
Chapter 2 - Summary of Planning Studies
Chapter 3 - Design Criteria
Chapter 4 - Solids Production and Thickening Options
Chapter 5 - Solids Processing
Chapter 6 - Solids Dewatering
Chapter 7 -Solids Disposal
Chapter 8 - Implementation Schedule and Cost
Volume 9 - Energy Management
Chapter 1 - Existing Energy Systems
Chapter 2 - Summary of Planning Studies
Chapter 3 - Existing and Future Energy Uses
Chapter 4 - Energy Saving Options
Chapter 5 - Power Supply Alternatives
Chapter 6 - Standby Power
Chapter 7 - Implementation Schedule and Cost
Volume 10 - Capital Improvement Plan and Overall Implementation Schedule
Chapter 1 - Capital Costs and Implementation Schedule
Chapter 2 - Operation and Maintenance Costs
Volume 11 - Financial Plan and User Rates and Fees
Chapter 1 - Master Plan Manager™
Chapter 2 - Financial Planning Tool
Chapter 3 - Master Plan Manager™ Help Menu
Volume 12 - Asset Management
Chapter 1 - Strategic Vision
Chapter 2 - Condition Assessment
Integrated Master Plan (All Volumes)
Seizing Our Destiny
Resources
Sanitary Sewer Overflow Reports
Survey and Land Records
CEQA Documents
Standard Drawings, Forms & Plans
CalGreen Building Standard Codes Title 24, Part 11
General Information
Address:
3900 Main Street - 4th Floor
Riverside, CA 92522
Phone:
(951) 826-5341
Hours
Monday - Friday
7:30am - 5:30pm
Closed Major Holidays
Printed from:
http://riversideca.gov/pworks/masterplan-wastewater.asp