You may not recognize it when you see it, but the equipment used to keep the lights on and the water flowing in Riverside is all around us. Here you can learn more about RPU's current projects.


Electric Projects

Citywide
Riverside Transmission Reliability Project (RTRP)
Citywide
LED Streetlights
Citywide
Advanced Meter Program
Ward 1
Hunter Substation Replacement Project
Wards 3, 5, 6 & 7
69kV Subtransmission System Reliability
Wards 1 & 3
Circuit 444 & 445 Pole Replacements

Where: Magnolia Center & Wood Streets Neighborhoods

  • Maintenance and repair work of existing electrical system infrastructure
  • Replacement of:
    • 170 utility poles
    • 46 transformers
    • 22,800 linear feet of conductor and related overhead distribution facilities
  • New installations will enhance electrical system reliability in the area

Start: 03/2021

End: Fall 2024

Wards 1
Streetlight Replacement

Where: Downtown Neighborhood

  • Maintenance and repair work of existing electrical system infrastructure
  • Streetlight system will be upgraded to new streetlight standards
  • New installations will maintain the historical integrity of the existing 100-year-old system, utilize LED technology for energy efficiency, and improve street lighting levels in the area.
  • Project Map

Start: Spring 2023

End: Summer 2024

Wards 1 & 3
Overhead Electric System Inspection Program – Area 2 (Pole Inspections)

Where: Northside,Downtown, Wood Streets and Grand Neighborhoods

  • Improve overall electric system reliability in the area
  • Contractor will conduct overhead inspection and wood pole testing
  • Project Map

Start: October 2024

End: March 2025


Water Projects

Ward 2 & 5
Water Transmission Valve Replacement Project (Phase V)

Where: Arlington Heights, University & Eastside Neighborhoods

  • Maintenance and repair work of existing water system infrastructure
  • Work includes installation of 4 water transmission main valves in the following locations:
    • Mockingbird Reservoir (1 valve)
    • Chicago Avenue & 7th Street (2 valves)
    • Park Ave (1 valve)
    • Trench Repaving
  • New installations will improve water system operations and reliability
  • Project Map

Estimated Start: Summer 2022

Estimated Completion: Winter 2023

Ward 1
Market Street Water Main Replacement Project

Where: Downtown Neighborhood

  • Maintenance and repair work of existing water system infrastructure
  • Work includes:
    • Construction of approximately 1,200 linear feet of 12-inch ductile iron pipe and 15 water services
    • Replacing an 8-inch Matheson Steel water pipeline
    • Installation of 2 Fire Hydrants
    • Installation of 5 System Connections
    • Pavement Restoration
  • Replacement of this pipeline will enhance the water system’s reliability and fire flow in the area.
  • Project Map

Estimated Start: Fall 2023

Estimated Completion: Summer 2024

Ward 4
Lincoln Avenue Techite Pipeline Replacement Project (between Jefferson and Madison)

Where: Casa Blanca Neighborhood

  • Replacement of aged and undersized water pipelines currently in use along Lincoln Avenue
  • Work includes:
    • Replacing approximately 3,400 linear feet of 42-inch Techite pipeline along Lincoln Avenue with 54-inch diameter CML&C steel pipeline.
    • Pavement Restoration
  • Project Map

Estimated Start: Fall 2023

Estimated Completion: Spring 2025

Ward 5
Glencoe Drive and Monticello Avenue Water Main Replacement Project (Phase I)

Where: Ramona Neighborhood

  • Maintenance and repair work of existing water system infrastructure
  • Work includes:
    • Construction of approximately 3,640 Feet of PVCOPipe
      75 Water Service Connections
      6 Fire Hydrants
      6 System Connections and Incidental Work
    • Pavement Restoration
  • Project Map

Estimated Start: Fall 2023

Estimated Completion: Summer 2024

Ward 5
Garfield and Overland Water Main Replacement Project (Phase III)

Where: Ramona Neighborhood

  • Maintenance and repair work of existing water system infrastructure
  • Work includes:
    • Construction of approximately 3,100 Feet of PVCO Pipe
      83 Water Service Connections
      6 Fire Hydrants
      6 System Connections and Incidental Work
    • Pavement Restoration
  • Project Map

Estimated Start: Spring 2024

Estimated Completion: Winter 2024

NOTE: Dates may be subject to change