Find building permits, download electric design service application, or use our helpful checklist. For further engineering and development-related assistance, please contact us. For information on our One Stop Shop, please visit Streamline Riverside.
Apply for electric design services.
Download our application for electric design services. You can also check interconnection standards FYI.
See if you're a qualified electrical worker.
Every entry by any personnel into a Public Utilities high voltage distribution structure will require the presence of a Qualified Electrical Worker (QEW).
Check building permits.
See a list of links to all the Riverside building permits you’ll need for building safely.
General Information
Meter spots, temporary power, access to Riverside building permits, and more.
Electric Design Service Application
See the application for starting services in electric design.
Interconnection Guide
Read about the standards for interconnected non-utility-owned electric generation.
Qualified Electrical Worker
Underground Construction Standards
Electric Rules & Rates
See electric rates as well as criteria for water services within the service boundary.